VM Recovery Time Degradation From Batch Limitations
scaling
Recovery operations limited to small batch sizes (5-15 VMs) dramatically extend RTO during mass restoration scenarios. This creates a recovery bottleneck during disaster recovery or ransomware recovery operations.
Cohesity insight details requires a free account. Sign in with Google or GitHub to access the full knowledge base.
Sign in to access